Rebar Shop Drawing Abbreviations and Notation

Rebar shop drawing abbreviations are shorthand for where bars go and what they are: EF means each face, EW each way, T&B top and bottom, NF and FF near face and far face, and a letter in front of the bar size (C, G, S or F) flags specialty bar. Most Canadian detailers use the abbreviations listed in the Reinforcing Steel Institute of Canada (RSIC) Manual of Standard Practice, but every set should carry its own legend, and that legend wins if it differs.

This page is a working legend, grouped by what the abbreviations describe. For how to read a full sheet step by step, see how to read rebar shop drawings.

How a rebar callout is put together

Most callouts follow the same order, and the abbreviations slot into it:

quantity, size, mark, spacing, location

For example, 12-15M-W04 @ 300 VEF reads as 12 bars, size 15M, mark W04, at 300 mm centre to centre, vertical on each face. Change one abbreviation and you change where the bars go, so it pays to know them cold.

Spacing (@ 300) is centre to centre unless stated. Dimensions on bar lists are out to out (O/O) of the bar.

Layers and faces

These are the abbreviations that cause the most placement errors.

Abbreviation Meaning Where you see it
T / TOP Top Slabs, beams, footings
B / BOT Bottom Slabs, beams, footings
T&B Top and bottom Bars in both layers
EW Each way Same bar in both directions
TEW / BEW Top each way / bottom each way Slabs and footings
TLL, TUL Top lower layer, top upper layer Two-layer top mats
BLL, BUL Bottom lower layer, bottom upper layer Two-layer bottom mats
BML / ML Bottom middle layer / middle layer Three-layer mats
LW / SW Long way / short way Footings and rectangular slabs
BLW / BSW Bottom long way / bottom short way Footings
EF Each face Walls, deep beams
NF / FF Near face / far face Walls, relative to the view
IF / OF Inside face / outside face Walls, tanks, foundation walls
VEF / HEF Vertical each face / horizontal each face Walls
VIF, VOF Vertical inside face, vertical outside face Walls
HIF, HOF, HNF, HFF Horizontal inside, outside, near and far face Walls
NS / FS / BS Near side / far side / both sides Beams, walls

Many detailers also number layers from the outside in: T1 and B1 are closest to the concrete surface, T2 and B2 sit behind them. Watch FF: it can mean far face or finished floor, depending on context. If it appears next to an elevation, it is almost certainly finished floor.

Near face and far face are defined relative to the view you are looking at, so check which side of the wall the section is cut from before you place NF bars.

Location and geometry

Abbreviation Meaning
TOC, TOS, TOW, TOF Top of concrete, slab, wall, footing
BOF Bottom of footing
EL Elevation
FOC, FOW Face of concrete, face of wall
CL Centre line
GL Grid line
CTR'D Centred
CLR Clear (clear cover or clear spacing)
O/O Out to out
C/C, O/C Centre to centre, on centre
EQ Equal (spaces)
LE, RE, EE Left end, right end, each end
CA, CB Column above, column below
OPNG Opening
THK Thickness
NTS Not to scale

Bars, shapes and splices

Abbreviation Meaning
CONT Continuous: lap as needed to run the full length
ALT Alternate: every other bar, or alternating lengths or ends
STAG Staggered (usually laps or bar ends)
ADD'L / ADD Additional bars on top of the typical layout
STR Straight
DWL Dowel
STIRR / STIR Stirrup
SP Spiral
H / HK Hook (standard hook unless dimensioned)
HH / H2E Hook each end, hook both ends
TEMP Temperature (shrinkage) steel
TRANSV, LONG Transverse, longitudinal
IR Integrity reinforcement (flat slabs at columns)
SB Support bars
DL / DEV, Ld Development length; tension development length
TS / TLS Tension splice, tension lap splice
MC / MECH Mechanical (coupler or splice)
CTS Cut to suit (length fitted to actual conditions)
SC/1, SC/2 Saw cut one end, saw cut both ends
THR/1, THR/2 Threaded one end, threaded both ends
WWF / WWM Welded wire fabric or mesh

On the bar list, bend shapes are given by RSIC type: numbered types for main bars, S types for stirrups, T types for ties, and X for special shapes with a sketch. Don't confuse a T-type tie shape with T for top. Our post on rebar bending shape codes explains the numbering.

Elements, joints and project terms

Abbreviation Meaning
FTG, SF, SDF Footing, strip footing, step-down footing
FDN Foundation
GB, TB, BT Grade beam, tie beam, beam tie
BM, COL Beam, column
SL, SOG Slab, slab on grade
RW / RET.W Retaining wall
CANT Cantilever
CMU Concrete masonry unit (block)
CIP, PC Cast in place, precast
CJ Construction joint
CLJ Control joint
EJ / EXP.JT Expansion joint
IJ Isolation joint
GID Grout in dowels
P/T, PT Post-tensioning
EX / EXIST Existing
SIM Similar: same idea, check for differences
TYP Typical: applies to all similar locations
TBC / TBD To be confirmed / to be determined
NIC Not in contract
R/W, W/ Reinforced with, with

Pay attention to TBC and TBD. A bar marked that way is waiting on an answer from the engineer and should not be fabricated until it is resolved.

Specialty bar prefixes

Canadian practice flags specialty reinforcement with a letter in front of the bar size, on both the placing drawings and the bar list:

Prefix Material Example
C Epoxy-coated C15M @ 300
G Galvanized G15M @ 250
S Stainless steel S20M @ 250
F Fibre reinforced polymer (GFRP) F20M @ 200

You may also see ECR (epoxy coated reinforcement), HDG (hot dipped galvanized) and GFRP written out in notes. If a specialty bar is missing its prefix anywhere on the set, query it. Mixing plain and coated bar in a corrosive location is a costly mistake. See types of rebar in Canada for what each material is used for.

When an abbreviation is not on the list

Detailers and engineers invent shorthand, especially for project-specific items. When you hit one you don't recognize:

  1. Check the sheet legend and general notes first. Most sets define their abbreviations on the first sheet.
  2. Check the structural drawings. Placing drawings often reuse the engineer's terms.
  3. Ask before you place. An RFI or a call to the detailer costs minutes. Placing bars on the wrong face can cost a pour.

If you review placing drawings regularly, our rebar shop drawing review checklist covers what to check beyond the notation, and Canadian rebar detailing standards explains where these conventions come from.

Drawings you can read at a glance

We prepare bar lists and placing drawings from your structural drawings using standard Canadian notation, with a legend on the set. If anything on a set we detailed is unclear, ask us before the bars go in. We also cut, bend, tag and deliver the bar from 10M to 55M, including GFRP.

Send your drawings for a free take-off and quote, or see our rebar detailing and fabrication services.

Frequently asked questions

What does EF mean on rebar shop drawings?

EF means each face. In a wall with two curtains of steel, a callout such as 15M @ 300 EF means that size and spacing on both faces. VEF and HEF narrow it to vertical or horizontal bars on each face.

What does EW mean on a rebar drawing?

EW means each way: the same bar size and spacing runs in both directions. TEW and BEW mean top each way and bottom each way.

What does T&B mean on a rebar drawing?

T&B means top and bottom. The bars in the callout are placed in both the top and bottom layers of the slab, beam or footing.

What do the letters C, G, S and F in front of a bar size mean?

They flag specialty bar under Canadian practice: C for epoxy-coated, G for galvanized, S for stainless steel and F for fibre reinforced polymer such as GFRP. C15M @ 300 is epoxy-coated 15M at 300 mm.